Hardware · Industrial automation [HA · MILL AUTOMATION]

Mill automation

Flour, rice and textile mills that run on numbers, not guesses.

Monitoring and control for mills — throughput, motor load, bin levels and energy use — so the owner sees the mill's real performance from anywhere.

Talk to us about this Scoped and quoted after one call

Mill automation

Built with
Epsilon1 terminal, RS485 / Modbus, Load and level sensors, Cloud dashboards
A first step
Epsilon1 — 2–6 weeks to first vertical
You own
Schematics, board files, firmware source and the bill of materials. Yours to have built by anyone.
Where it runs
Installed on site. Pakistan, the Gulf and the UK.
Scoping
One call, then a written scope. We say no when it is not ours.

Contact salesGet a quote

01 The terms

We quote the work after one call, in writing, against a scope you can hold us to. No published band, because a number without a scope is a guess — and no retainer that quietly renews.

What you get at the end is the thing itself and everything needed to keep it running without us. That is the deal on every job, whatever it is.

02 What we build

01 / 061

Throughput and yield measurement

02 / 062

Motor load and vibration

Motor load, temperature and vibration monitoring

03 / 063

Bin and silo levels

Bin and silo level sensing

04 / 064

Energy per tonne

Energy use per shift and per tonne

05 / 065

Batch records

Batch and shift records

06 / 066

Stoppage alerts

Alerts for stoppages and faults

03 Examples

Three things we could build for you here. They show the range; they are not a client list.

01 / 03

A flour mill's yield and energy per tonne

02 / 03

A rice mill's motor and bin monitoring

03 / 03

A textile mill's loom uptime board

Scroll sideways for the rest3 examples

04 Is this you?

Who asks for this

  • Mill owners who cannot be on site
  • Mills losing yield without knowing where

What we build it with

Epsilon1 terminalRS485 / ModbusLoad and level sensorsCloud dashboards

Next Mill automation

Tell us what it has to do.

No form, no sales sequence. Write two lines about the problem and you will get a person who has read them.